IMPLEMENTATION LEVEL

NFI

AFFECTED FLOW

Outflow (subsidised)

ANNOUNCED AS TEMPORARY

Yes

NON-TRADE-RELATED RATIONALE

No

ELIGIBLE FIRMS

firm-specific

JUMBO

No

TARIFF PEAK

No
← back to the state act
Inception date: 04 Jul 2011 | Removal date: 02 Sep 2011
Still in force

Trade finance

In July 2011, the Brazilian Development Bank (BNDES) provided the Bureau of Projects and Consulting (Bureau de Projetos e Consultoria LTDA) with post-export credit for a project involving the exporting of services for the engineering design of a tunnel in Agua Negra.

The post-export credit agreement was signed on 4 July 2011. The loan amount is USD 15.99 million at an annual interest rate of 4.6 percent. The loan matured in September 2011.

AFFECTED COUNTRIES

MAP
TABLE
EXPORT

AFFECTED SECTORS AND PRODUCTS

542 General construction services of civil engineering works

Please report this page in case you detect an inaccuracy in its content.