IMPLEMENTATION LEVEL

NFI

AFFECTED FLOW

Outflow (subsidised)

ANNOUNCED AS TEMPORARY

No

NON-TRADE-RELATED RATIONALE

No

ELIGIBLE FIRMS

firm-specific

JUMBO

No

TARIFF PEAK

No
← back to the state act
Inception date: 07 Sep 2017 | Removal date: open ended
Still in force

Trade finance

The project value is 52 million CHF (54 million USD) and it finances the delivery of mechanical and electrical equipment, ready to use procurement, construction and commissioning of phase II of the Awash Weldia railway project by Molinari Rail AG, Winterthur.

The maturity of the loan will be longer or equal to two years. The SERV differentiates between nine categories of fiancial support. The present project is a buyer credit insurance (category B).

AFFECTED COUNTRIES

MAP
TABLE
EXPORT

AFFECTED SECTORS AND PRODUCTS

495 Railway & tramway locomotives & rolling stock; parts
8608 Railway or tramway track fixtures and fittings; mechanical (including electromechanical) signalling, safety or traffic control equipment for railways, tramways, roads, inland waterways, parking facilities, port installations or airfields; parts of the fo
860800 Railway or tramway track fixtures and fittings; mechanical (including electromechanical) signalling, safety or traffic control equipment for railways, tramways, roads, inland waterways, parking facilities, port installations or airfields; parts of the fo

Please report this page in case you detect an inaccuracy in its content.