IMPLEMENTATION LEVEL

NFI

AFFECTED FLOW

Outflow (subsidised)

ANNOUNCED AS TEMPORARY

No

NON-TRADE-RELATED RATIONALE

No

ELIGIBLE FIRMS

firm-specific

JUMBO

No

TARIFF PEAK

No
← back to the state act
Inception date: 25 Oct 2016 | Removal date: open ended
Still in force

Trade finance

The project value is 600.1 million CHF (603 million USD) and it finances the delivery of power plant components by Ansaldo Energia Switzerland AG, Baden.

The maturity of the loan will be shorter than two years. The SERV differentiates between nine categories of fiancial support. The present project is a pre-shipment risk insurance (category P).

AFFECTED COUNTRIES

MAP
TABLE
EXPORT

AFFECTED SECTORS AND PRODUCTS

461 Electric motors, generators & transformers; parts
8501 Electric motors and generators (excluding generating sets).
850164 Of an output exceeding 750 kVA

Please report this page in case you detect an inaccuracy in its content.