Inception date: 23 Jan 2012 | Removal date: 22 May 2012
Still in force

Trade finance

In January 2012, the Brazilian Development Bank (BNDES) provided Construtora Norberto Odebrecht SA with post-export credit for a project involving exporting goods and services for the construction of art pieces on the southeast road.

The post-export credit agreement was signed on 23 January 2012. The loan amount is USD 21.54 million at an annual interest rate of 3.12 percent. The loan matured in May 2012.

AFFECTED COUNTRIES

MAP
TABLE
EXPORT

AFFECTED SECTORS AND PRODUCTS

542 General construction services of civil engineering works