IMPLEMENTATION LEVEL

National

AFFECTED FLOW

Inflow

ANNOUNCED AS TEMPORARY

No

NON-TRADE-RELATED RATIONALE

No

ELIGIBLE FIRMS

all

JUMBO

No

TARIFF PEAK

No
← back to the state act
Inception date: 01 Apr 2014 | Removal date: 30 Oct 2014
Still in force

Public procurement localisation

On 27 March 2014, the Indian Ministry for New and Renewable Energy launched a support scheme for installation of 10'000 solar photovoltaic water pump systems.
 
The Ministry will provide 40% grant support for the installation of 10'000 solar photovoltaic water pump systems with a total project budget of INR 228 crores (USD 37 million). The scheme was introduced for a period of 2 years and required the use of domestically produced photovoltaic modules for the pump systems.
 
On 3 November 2014, the Ministry introduced a scheme with increase number of supported installations and revised guidelines. The current measure was merged into the new scheme (see related measure).
 

AFFECTED COUNTRIES

MAP
TABLE
EXPORT

AFFECTED SECTORS AND PRODUCTS

471 Electronic valves & tubes; electronic components; parts
8541 Diodes, transistors and similar semiconductor devices; photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light emitting diodes; mounted piezoelectric crystals.
854110 Diodes, other than photosensitive or light emitting diodes
854121 With a dissipation rate of less than 1 W
854129 Other
854130 Thyristors, diacs and triacs, other than photosensitive devices
854140 Photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light emitting diodes
854150 Other semiconductor devices
854160 Mounted piezoelectric crystals
854190 Parts

Please report this page in case you detect an inaccuracy in its content.